Environmental Engineering・2026

Plant-Wide SCADA for a Wastewater Treatment Plant

One screen per process unit, drawn on top of the P&ID. Equalization, aeration, chemical dosing, discharge and sludge dewatering are all included, with equipment status, levels and flows shown exactly where they belong.

Plant-Wide SCADA for a Wastewater Treatment Plant

CHALLENGE

Challenge

A wastewater treatment plant has many process units, including equalization, aeration, sedimentation, chemical dosing, discharge and sludge dewatering, and each one has its own pumps, blowers and sensors. The customer wanted screens that match the actual piping layout, so operators know which stage they are looking at, together with complete operating records.

SOLUTION

Solution

We used the P&ID as the base and built one screen per unit, placing the status of pumps, blowers, dosing units and valves, plus live level, flow, pH and conductivity readings, exactly where they sit in the process. Every equipment action and alarm is written to the historical database, and reports are pulled straight from the system. More than ten screens were built, and the biogas section runs on the same system.

EQUIPMENT

Equipment and Technology

  • SCADA system
  • PLC communication integration
  • Flow meters, level meters, pH and conductivity meters
  • SQL historical database

RESULTS

Results

  • More than ten process unit screens
  • Drawn one-to-one from the P&ID
  • Complete alarms, history and reports

Operators can follow the whole plant process from the screens. Which stage is abnormal, and who operated what and when, can all be looked up.

GALLERY

Site Photos

  • Plant-Wide SCADA for a Wastewater Treatment Plant 1
  • Plant-Wide SCADA for a Wastewater Treatment Plant 2
  • Plant-Wide SCADA for a Wastewater Treatment Plant 3
  • Plant-Wide SCADA for a Wastewater Treatment Plant 4
  • Plant-Wide SCADA for a Wastewater Treatment Plant 5
  • Plant-Wide SCADA for a Wastewater Treatment Plant 6
  • Plant-Wide SCADA for a Wastewater Treatment Plant 7
  • Plant-Wide SCADA for a Wastewater Treatment Plant 8
  • Plant-Wide SCADA for a Wastewater Treatment Plant 9